49 lines
1.3 KiB
Groff
49 lines
1.3 KiB
Groff
.TH ONEAC 8 "Tue Oct 22 2002" "" "Network UPS Tools (NUT)"
|
|
.SH NAME
|
|
oneac \- Driver for Oneac UPS equipment
|
|
.SH NOTE
|
|
This man page only documents the hardware\(hyspecific features of the
|
|
oneac driver. For information about the core driver, see
|
|
\fBnutupsdrv\fR(8).
|
|
|
|
.SH SUPPORTED HARDWARE
|
|
This driver supports Oneac EG and ON UPS equipment with the
|
|
Advanced Interface. If your UPS is equipped with the Basic
|
|
Interface card, use the genericups driver.
|
|
|
|
.SH EXTRA ARGUMENTS
|
|
This driver supports the following optional settings in the
|
|
\fBups.conf\fR(5):
|
|
|
|
.IP "testtime=\fInum\fR"
|
|
Change battery test time from the 2 minute default.
|
|
|
|
.SH INSTANT COMMANDS
|
|
This driver supports the following Instant Commands.
|
|
|
|
.IP "reset.input.minmax"
|
|
Reset the minimum and maximum input line voltage values
|
|
seen since the last reset or power on.
|
|
|
|
.IP "test.battery.start"
|
|
Start a battery test. The default time is 2 minutes. This
|
|
time can be set in the ups.conf file. See \fBtestime\fR above.
|
|
|
|
.IP "test.battery.stop"
|
|
Stops a battery test that is in progress.
|
|
|
|
.IP "test.failure.start"
|
|
Starts a 15 second long simulation of an input power
|
|
failure.
|
|
|
|
.SH AUTHOR
|
|
Eric Lawson <elawson@inficad.com>
|
|
|
|
.SH SEE ALSO
|
|
|
|
.SS The core driver:
|
|
\fBnutupsdrv\fR(8)
|
|
|
|
.SS Internet resources:
|
|
The NUT (Network UPS Tools) home page: http://www.networkupstools.org/
|