nut-debian/docs/man/oneac.txt
2011-01-26 10:35:08 +01:00

63 lines
1.3 KiB
Plaintext

ONEAC(8)
========
NAME
----
oneac - Driver for Oneac UPS equipment
NOTE
----
This man page only documents the hardware-specific features of the
oneac driver. For information about the core driver, see
linkman:nutupsdrv[8].
SUPPORTED HARDWARE
------------------
This driver supports Oneac EG and ON UPS equipment with the
Advanced Interface. If your UPS is equipped with the Basic
Interface card, use the genericups driver.
EXTRA ARGUMENTS
---------------
This driver supports the following optional settings in the
linkman:ups.conf[5] file:
*testtime*='num'::
Change battery test time from the 2 minute default.
INSTANT COMMANDS
----------------
This driver supports the following Instant Commands.
*reset.input.minmax*::
Reset the minimum and maximum input line voltage values
seen since the last reset or power on.
*test.battery.start*::
Start a battery test. The default time is 2 minutes. This
time can be set in the *ups.conf* file. See *testime* above.
*test.battery.stop*::
Stops a battery test that is in progress.
*test.failure.start*::
Starts a 15 second long simulation of an input power
failure.
AUTHOR
------
Eric Lawson <elawson@inficad.com>
SEE ALSO
--------
The core driver:
~~~~~~~~~~~~~~~~
linkman:nutupsdrv[8]
Internet resources:
~~~~~~~~~~~~~~~~~~~
The NUT (Network UPS Tools) home page: http://www.networkupstools.org/